§ 22.19. [Meter Service].  


Latest version.
  • For the purpose of this Chapter to regulate the issuing of permits, each recording watt-hour meter and all feeder wires, sub-feeder wires and branch circuit wires connecting the same shall be constructed as one meter service, and a separate permit must be obtained for work requiring a permit performed on each such meter service.

(Ord. of 12-6-1971, § 1)