Orlando |
Code of Ordinances |
Chapter 58. ZONING DISTRICTS AND USES |
Part 5. ACCESSORY USES AND STRUCTURES |
Appendix 5B. SPECIFIC ACCESSORY USES AND STRUCTURES |
Appendix 5. DOCKS |
§ 58.976. Building Permit Application and Procedures.
(A)
No dock construction or repair shall occur unless permitted by the City.
(B)
All permit applications shall include the following:
1.
The original signature of the property owner of the upland parcel to which the dock shall be attached;
2.
The original signature of the applicant, if the applicant is not the property owner;
3.
Satisfactory evidence of title to the upland parcel to which the dock shall be attached;
4.
Satisfactory evidence that all necessary riparian rights for the construction, access and use of the dock are vested to the upland parcel to which the dock shall be attached;
5.
A copy of a current survey of the parcel, including projected property lines;
6.
Four (4) sets of a site plan depicting the following:
a.
The name and dimensions of the waterbody upon which the dock is to be located;
b.
The High Water Elevation (HWE);
c.
The location and dimensions of the dock;
d.
The floor and roof elevations of the dock;
e.
The location of all lifts, hoists, mooring pilings and mooring areas on the dock;
f.
The length of the dock between the HWE and its point most waterward of the HWE;
g.
The distance between the existing shoreline at the point where the dock exists or will be constructed and a permanent upland marker;
h.
The distance between the dock and all adjacent property lines;
i.
Location of any existing docks attached to upland property abutting the upland property to which the proposed dock is to be attached;
j.
The water depth at the terminus of the dock and at all proposed mooring locations;
k.
The location of any conservation easement areas and wetlands within twenty feet of any portion of the dock;
l.
The scale to which the sketch was prepared; and
m.
An arrow indicating north.
7.
Any plan to mitigate adverse impacts to conservation areas or wetlands caused by dock construction or repair;
8.
Description of sediment and erosion control measures to be used during construction or repair of the dock; and
9.
Statement of the intended purpose of the dock as a public, semi-private, or private use.
(Ord. of 1-24-2005, § 20, Doc. #050124909; Ord. of 3-9-2009, § 1, Doc. #0903091102)