§ 58.976. Building Permit Application and Procedures.  


Latest version.
  • (A)

    No dock construction or repair shall occur unless permitted by the City.

    (B)

    All permit applications shall include the following:

    1.

    The original signature of the property owner of the upland parcel to which the dock shall be attached;

    2.

    The original signature of the applicant, if the applicant is not the property owner;

    3.

    Satisfactory evidence of title to the upland parcel to which the dock shall be attached;

    4.

    Satisfactory evidence that all necessary riparian rights for the construction, access and use of the dock are vested to the upland parcel to which the dock shall be attached;

    5.

    A copy of a current survey of the parcel, including projected property lines;

    6.

    Four (4) sets of a site plan depicting the following:

    a.

    The name and dimensions of the waterbody upon which the dock is to be located;

    b.

    The High Water Elevation (HWE);

    c.

    The location and dimensions of the dock;

    d.

    The floor and roof elevations of the dock;

    e.

    The location of all lifts, hoists, mooring pilings and mooring areas on the dock;

    f.

    The length of the dock between the HWE and its point most waterward of the HWE;

    g.

    The distance between the existing shoreline at the point where the dock exists or will be constructed and a permanent upland marker;

    h.

    The distance between the dock and all adjacent property lines;

    i.

    Location of any existing docks attached to upland property abutting the upland property to which the proposed dock is to be attached;

    j.

    The water depth at the terminus of the dock and at all proposed mooring locations;

    k.

    The location of any conservation easement areas and wetlands within twenty feet of any portion of the dock;

    l.

    The scale to which the sketch was prepared; and

    m.

    An arrow indicating north.

    7.

    Any plan to mitigate adverse impacts to conservation areas or wetlands caused by dock construction or repair;

    8.

    Description of sediment and erosion control measures to be used during construction or repair of the dock; and

    9.

    Statement of the intended purpose of the dock as a public, semi-private, or private use.

(Ord. of 1-24-2005, § 20, Doc. #050124909; Ord. of 3-9-2009, § 1, Doc. #0903091102)