§ 63.270. Retention/Detention Facilities Requirements.  


Latest version.
  • All development shall be required to provide pollution abatement as required by the water management district within which the development is located. The additional volume and rate of stormwater runoff generated by the building site due to development from a 25 year frequency, 24 hour duration storm event shall be controlled by a detention facility and released at a rate of discharge not to exceed the peak rate of discharge of the site in the predeveloped condition and conveyed to a point of legal and positive discharge.

(Ord. of 9-16-1991, Doc. #25100; Ord. No. 2016-41, § 1, 5-9-2016, Doc. #1605091201)