§ 7.306. Responsibility of Bidders and Respondents.
A.
Standards. Factors which may be considered in determining whether the standard of responsibility has been met include without limitation whether a prospective contractor has:
1.
Available the appropriate financial, material, equipment, facility and personnel resources and expertise, or the ability to obtain them, necessary to indicate its capability to meet all contractual requirements;
2.
A satisfactory record of performance with the City and other entities;
3.
A satisfactory record of integrity and fair dealing;
4.
The legal qualifications to contract with the City; and
5.
Promptly supplied all necessary information in connection with the inquiry concerning responsibility.
B.
Written Determination of Non-Responsibility Required. If a bidder or respondent who otherwise would have been awarded a contract is found non-responsible, the Chief Procurement Officer shall issue a written determination of non-responsibility setting forth the basis of the finding.
(Ord. No. 2012-44, §§ 1, 2(Att. A), 11-5-2012, Doc. #1211051201; Ord. No. 2016-47, § 1, 5-23-2016, Doc. #1605231202)