§ 58.840. General Requirements.  


Latest version.
  • (a)

    All communication towers shall be subject to these land development regulations (including Figures 2B and 2D in Chapter 58, Orlando City Code), the City of Orlando Engineering Standards Manual, Downtown Design Guidelines and Downtown Streetscape Design Guidelines as applicable. A communication tower is a permitted use in the General Industrial District and the Industrial Park District. Communication towers in other zoning districts may be permitted upon the granting of a Conditional Use Permit. Additionally, communication towers located inside:

    (1)

    a Historic Preservation Overlay District must obtain a certificate of appropriateness prior to the issuance of any permit for the construction, installation, or alteration of a communication tower or communication antenna;

    (2)

    the Downtown CRA and outside a Historic Preservation Overlay District must obtain a certificate of appearance approval;

    (3)

    the Traditional City (/T) Overlay Zoning District, a Special Plan (SP) Overlay Zoning District or a Planned Development (PD) Zoning District shall require Urban Design review as part of the Engineering permit process.

(Ord. of 9-16-1991, Doc. #25094; Ord. No. 2016-39, § 2, 4-18-2016, Doc. #1604181201)