§ 7.500. Selection of Construction Contracting Delivery Methods.  


Latest version.
  • The Chief Procurement Officer, or designee, shall have the ability to use the appropriate construction delivery method, which may include but is not limited to design-bid-build, design-build, construction-manager-at-risk, task order-contracting, or other lawful methods. In determining which method to use, consideration shall be given to the City's requirements and resources. Notwithstanding Section 7.302 of this Chapter, the Public Works Director or designee shall be responsible for the designation of the construction procurement methodology.

(Ord. No. 2012-44, §§ 1, 2(Att. A), 11-5-2012, Doc. #1211051201)